Arcelik / Kasa Stroy – Case Study
Nov. 2, 2018
Project Name
Arcelik Wastewater Treatment Plant
Employer
Arcelik
Contractor
Enta Miihendislik Aritma Taah. San. Ve Tic. Ltd. Sti.
Location of the plant
BOLU/TURKEY
Scope of work
Industrial and Domestic Wastewater Treatment Plant
Contract Date
2007
Completion Date
2007
Flowrate of the plant: 1.405 m3/day
Inlet Pollution Parameters:
COD: 640-700 mg/L
SS: 110-330 mg/ L
Outlet Discharge Values
COD: 100 mg/L
SS: 125 mg/ L
Oil & Grease: 20 mg/L
PH: 6-9
Units of the Plant:
Physical Treatment
- Screening
- DAF Unit
Chemical Treatment
- Coagulation
- Flocculation
- Chemical Sedimentation Basin
Biological Treatment
- Aeration Basin with Blower and Diffuser System
- Biological Sedimentation Basin
Sludge Dewatering
- Sludge Thickening Tank
- Filter Press