- Home
- Companies
- Mobiltex Data Ltd.
- Articles
- ATCO - Case Study
ATCO - Case Study
Monitoring an expansive natural gas distribution network in remote locations, while ensuring worker safety.
As part of ATCOs globally diverse operations, ATCO provides natural gas to over 2 million customers with the majority located throughout Alberta and Northern Canada through an expansive network of transmission and distribution pipelines running thousands of kilometers across some of the most challenging and difficult to access locations in the country. As ATCO’s energy infrastructure has grown, so has the scale of the cathodic protection (CP) system required to sufficiently protect its steel pipeline assets from corrosion.
SOLUTION: A SUCCESSFUL CORTALK TRIAL LEADS TO COMPLETE COVERAGE FOR THE TRANSMISSION NETWORK
RESULTS: SIGNIFICANT OPERATIONAL SAVINGS AND ENHANCED PIPELINE PROTECTION
