Dragflow S.r.l.
  1. Companies
  2. Dragflow S.r.l.
  3. Articles
  4. Case study - drilling operations

Case study - drilling operations

SHARE
Oct. 30, 2011
Courtesy ofDragflow S.r.l.

Location: New Zeland
Year: 2010

Working contest
The pond is on a drilling rig site. The rig is used for Geo-thermal power exploration.

The Problem
Pumping heavy slurry: bentonite, geo-thermal minerals, drilling fluid, sand, pumice. Performance of sucker trucks where unsatisfactory.

Our solution
Dragflow HY50 driven by a 13 Ton CAT digger. Spray ring / HH80 Sykes Pump. The unit out performed traditional method of using sucker trucks. Using sucker trucks 2 weeks, Dragflow Pump 4 Days , 70% less time consumption and costs.