Eggersmann GmbH

Case study - MBT Posen

SHARE
Jan. 10, 2017
Courtesy ofEggersmann GmbH

Engineering and planning, procurement, production and delivery of machinery and materials handling as well as installation and commissioning of parts of a plant for mechanical and biological treatment.

Customer:
ZZO Poznan

Retention:
October 2014

Acceptance:
June 2016

Input:
Biowaste / Green waste -> Digestate / Loppings

Throughput:
12.000 Mg/a 12.000 Mg/a 22.000 Mg/a 6.000 Mg/a

Mechanical treatment:

  • Screendrum
  • Feed hopper with decompator
  • Magnetic separators
  • Shredder

Biological treatment:
Dry fermentation in 7 tunnels (29 x 4,45 x 5,6), then tunnel composting in 7 tunnels (25 x 5,45 x 5)

Materials for further processing:

  • Compost
  • Metal

Special components:

  • Tunnel filling unit