Problem

Anguil was called in to provide an engineering evaluation of a competitor`s RTO that was suffering from visible deterioration and `hot spot` issues. Due to the customer`s production schedule, an internal inspection was not possible prior to the plant shutdown for repairs.

Action

Anguil was able to couple knowledge of the customer`s process with its RTO experience and provide a plan to repair the damaged parts and to replace the RTO media and insulation.

Solution

Anguil arranged for a Senior Design Engineer to be on site during the project so that each step could be approved instantly. As a result of Anguil`s preparation and experience, the installation team was prepared for contingencies and system repairs were completed on time.

  • A complete ceramic media replacement was done
  • Insulation erosion and `hot spot` issues were addressed and fixed