CPL, Immingham - Case Study
Nov. 5, 2025
Courtesy ofERG (Air Pollution Control) Ltd
- Client: CPL
- Site: Immingham
- Application:
- Syngas treatment and integrated energy recovery for UK’s largest AD digestate gasification pilot plant
- Syngas oxidation: CO, tars, hydrocarbons and solids
- Waste heat used to dry feed material to plant
- Gas inlet 198kg/h, 650oC
Most popular related searches
direct fired thermal oxidizer
cyclone dust removal
air mixing
thermal oxidizer
solid waste
dust control
solid waste drying
hydrocarbons waste
digestate
digester
Equipment:
- CS Direct Fired Thermal Oxidiser, ceramic fibre lining
- CS Cyclone for dust removal
- CS Mixing air mixing bustle
- SS Fan and ductwork
- SS Stack, 15m, double-skin
Year delivered: 2024