Lindorm, Inc.

Gravity Environmental - Budd Inlet, Washington State - Case Study

SHARE
Dec. 8, 2020
Courtesy ofLindorm, Inc.

Description: In 2007, the Port of Olympia found elevated levels of dioxins in an area scheduled for maintenance dredging. The contaminated sediments have since been dealt with. During this project SediMeters™ were deployed in the area to monitor for near-bed elevated turbidity levels. The SediMeter™ instruments were mounted on steel platforms for sedimentation measurements in the Budd Inlet.

Where: Budd Inlet, Washington State

Who: Gravity Environmental

Why: Polluted Sediments Cleanup

What: Measure sedimentation in the inlet

When: 2014

Model: SM3A

Most popular related searches