ENTA Treatment Systems Engineering Contracting Corporation

Kerevitas – Case Study

SHARE
Nov. 2, 2018

Project Name
Kerevitas Wastewater Treatment Plant

Employer
Kerevitas Gida San. ve Tic. A.S.

Contractor
Enta Muhendislik Antma Taah. San. Ve Tic. Ltd. Sti.

Location of the plant
BURSA/TURKEY

Scope of work
Industrial Wastewater Treatment Plant           

Contract Date
2013

Completion Date
2014

Flowrate of the plant: 1.500 m3/day

Inlet Pollution Parameters:

COD: 2200 mg/L
Ss: 300 mg/ L
PH: 5-9
OIL & GREASE: 85 mg/ L
TEMPERATURE: 10-30*C

Outlet Discharge Values

COD: 160 mg/L
SS: 60 mg/L
PH: 6-9
OIL & GREASE: 20 mg/ L

Units of the Plant:

Physical Treatment

  • Static Screen

Biological Treatment

  • Aeration Basin with Blower and Diffuser System
  • Sedimentation Basin

Sludge Dewatering

  • Sludge Thickening Tank
  • Decanter