Conducted in Saguenay, on a 28 MVA three-phase transformer installed on a 10’ x 20’ concrete base in an HV substation. Our hosts were the first to understand the potential of our concept and to support a pilot installation. Priceless data was gathered from both sites, which had vastly different characteristics. This allowed us to design a new-generation oil spill management system.