Astim A.S.
Timisoara WWTP Project Romania - Case Study
May. 7, 2018
Courtesy ofAstim A.S.
- Customer: PWT (Germany)
- Project Name: Timisoara WWTP
- Manufacturing year: 2009

Scope of supply
- 4 pcs. Longitudinal Grit & Grease Scraper Bridges (with Control Panel, Grease Ramps and Motorized Cable Drums); Dry Parts = CS + Sand B. + Epoxy Coating, Wet Parts = AISI 304
- 4 pcs. Ø 40 m Full Type SST Scraper Bridges (with Weirs, Baffles and Control Panels); Dry Parts = CS + Sand B. + Epoxy Coating, Wet Parts = AISI 304.
- 4 pcs. Ø 48 m Full Type SST Scraper Bridges (with Weirs, Baffles and Control Panels);
- Dry Parts = CS + Sand B. + Epoxy Coating, Wet Parts = AISI 304.
Most popular related searches
