Walthamstow Academy - Case Study
Project Duration: 7 weeks
Completed: June 2014
Contract Value: £365,000
Floor Area: 325m²
Turnkey service elements completed:
- Design
- Manufacture
- Delivery
- Installation
- Internal fit out
“The installation of the buildings went very smoothly. We are very pleased with our new buildings”
Modulek provided a full ‘Turnkey’ service to the school, supplying and installing two double classroom building over the summer ready for the new school year.
Both identical, the buildings have been designed with a mixture of render and attractive cedar cladding externally. The groundworks included providing a level access whilst adapting to existing ground levels and extensive service connection enabling works. The project also involved liaising and working with the school’s specialist service installation provider.
The light and airy classrooms provide the school with the perfect environment for their pupils to continue their education.
Key Benefits of using Modular:
Affordable
Manufactured off-site
Minimal preparation required
Short build time
Rapid installation
Waste reduced
Minimal disruption