ECOfluid Systems Inc.
7 Articles found

ECOfluid Systems Inc. articles

  • Project: Commercial Development
  • Location: Osoyoos, British Columbia
  • Capacity: 500 m3/d (130,000 gpd)
  • Contract: Design-Supply-Install

Key Features: Modular and Expandable, Enhanced Nitrogen Reduction;Mixed Residential/ Commmerial/ Light Industrial Users; Architecturally Distinct, Sola

Jun. 21, 2021
  • Project: Childcare Center
  • Location: Simon Fraser University, Burnaby, BC
  • Capacity: 5 m3/d (2,000 gpd)
  • Contract: Design-Supply-Operate

Key Features: Living Building Challenge Compliant, Odorless, Noiseless, Out-of-sight

This USBF®

Jun. 21, 2021
  • Project: First Nation Community
  • Location: Nanoose Bay, British Columbia
  • Capacity: 120 m3/d (30,000 gpd)
  • Contract: Design-Supply-Install-Operate

Key Features: Modular and Expandable; Odor and Noise Abatement, Environmentally Sensitive Discharge;(SHellfish Bearing Waters); Good

Jun. 21, 2021
  • Project: Hospital
  • Location: Joshua Tree, CA
  • Capacity: 280 m3/d (75,000 gpd)
  • Contract: Design-Supply

Key Features: Modular and Expandable, Enhanced Nitrogen Reduction, Odor and Noise Abatement, Package Plant, Remote Supervisi

Jun. 21, 2021
  • Project: Residential Development
  • Location: Maple Ridge, BC
  • Capacity: 106 m3/d (28,000 gpd)
  • Contract: Design-Build-Operate

Key Features: Modular and Expandable; Class A Effluent; Good Neighbour Unobtrusive

This advanced wastewater treatment plant serv

Jun. 21, 2021
  • Project: Municipality
  • Location: Bowen Island, BC
  • Capacity: 240 m3/d (63,000 gpd)
  • Contract: Design-Build-Operate

Key Features: Modular and Expandable; Odour and Noise Abatement; Sludge Dewatering; External Membrane MBR Treatment; Effluent Reuse for Irrigation;Septage Rece

Jun. 21, 2021
  • Project: Ski Resort 
  • Location: Sun Peaks, BC
  • Capacity: 1,500 m3/d (400,000 gpd)
  • Contract: Design-Supply-Install

Key Features: Cold Climate Winter Operation, High Seasonal and Weekend Flows and Loadings, Modular and Expandable
After evaluating a few alternatives

Jun. 21, 2021