At our Edmonton Rail Terminal, we needed a vapor management solution that matched the scale of one of North America’s largest crude rail loading sites and, most importantly, protected our people and the environment. We partnered with Questor Technology to install three Q5000 Thermal Oxidizers to combust vapors displaced during railcar loading—vapors that can vary in composition and include O₂ and VOCs. The system integrates with our closed-system loading racks and nitrogen-purged vapor

Apr. 7, 2020

Questor Technology

At our Crossfield Gas Storage Facility north of Calgary, our flare system had become a real issue for the surrounding community. We were receiving ongoing complaints about visible black smoke and strong odours whenever we flared. To fix this, we brought in a Questor Q500 Thermal Oxidizer in 2004. The unit was designed to handle our dehydrator still-column vapours and stabilizer tank gases — a difficult stream with very high water content and methane/BTEX hydrocarbons — and to combust

Feb. 4, 2020

Questor Technology

  • Project Overview: SNC-Lavalin/Plains Midstream selected Questor Technology Inc. to provide thermal oxidization process control for use in their Fort Saskatchewan facility in Alberta, Canada.
  • Location: Fort Saskatchewan, Alberta, Canada
  • Equipment: Q250 Thermal Oxidizer
  • Application: Mercaptan oxidization (Merox) process gas
  • Mandate: Combustion of Merox process waste gas stream with no visible flame, no smoke and no odor.
  • Shipped: June 201
Sep. 18, 2019

Dave Das

Project Overview:
In 2015 Questor was selected to provide emissions control for a truck loading and tank vapors at a Shell oil battery in Alberta, Canada. The waste gas stream consists primarily of rich gasses, ethane (~19 mol%), propane (~35 mol%), butane (~24 mol%) and remaining hydrocarbons, ~35 mscf/d of fuel gas is required to draw the low pressure waste gas stream into the thermal oxidizer and generate a combustion vortex. Questor’s proprietary combustion tec

Sep. 18, 2019

Dave Das

Project Overview:
Gas Production Facilities Jambi Merang Development Project – a Joint Operating Body (JOB) Pertamina - Hess – Talisman project. This project was an EPCI Pre-Commissioning (engineering, procurement, construction, installation and pre-commissioning) gas processing program comprising four (4) work sites with the complete conditioning of gas and liquid. The program capacity being 120 BBTUD or equivalent to a 113 MMSCFD flow-rate. TRIPATRA was awa