RLC Technologies, Inc.

Project - Oman 2 - PDO

SHARE
Sep. 14, 2022

Project Description:
The 66" Diameter ATDU system is operated by Tradebe in the service of the PDO (Petroleum Development Oman). The unit is processing OBM drilling waste at a maximum rate of 8 metric tons per hour. The unit operates in parallel with a 54” diameter RLC ATDU.

Material:
OBM Drill Cuttings

Composition:
Solids Content: ±80%
Oil Content: ±10%
Water Content: ±10%

Start Date: 2017
Processing Rate: 8 ton/ hour

Most popular related searches