Sireg Geotech S.r.l
- Home
- Companies
- Sireg Geotech S.r.l
- Products
- Durvinil - Model TAM - Grouting Pipes
Durvinil - Model TAM -Grouting Pipes
Until a few years ago, the application field of injections was limited only to very permeable soils (made of gravel and sand) or fissured rocks. Nowadays, however, the use of sleeved grouting pipes (TAMs) together with suitable grouting mixtures, allows to widen the types of soils that can be treated, making possible to improve their mechanical and permeability characteristics.
Most popular related searches
grouting pipe
grout
grouting
grouting sleeve
tunnelling
waterproofing
tunnel grouting
soil treatment
soil permeability
tunnel excavator
The grouting technique by means of sleeved grouting pipes offers various benefits such as:
- injections can be carried out in various stages
- different mixtures can be injected for each grouting stage, in order to treat the soil in the most suitable way
- accurate treatment of the soil, since the sleeves are mounted on the pipes according to the customers` requirements
- possibility to repeat the injection at a later stage, using the same pipes already installed in the soil
Injection treatments through sleeved grouting pipes are required in the following cases:
- Strengthening of foundations, which may be needed due to increased structural load, restoration of ancient buildings or the creation of underground spaces below them.
- Large excavation pits and earthworks, in order to waterproof or consolidate, as an alternative or in addition to diaphragm walls and sheet piles.
- Dam construction, which require waterproofing of foundation soil as well as of the abutments
- Tunnel construction, where injections can be carried out sub horizontally (umbrella method), from road level in case of shallow tunnels, from a side tunnel in case of two parallel tunnels, from pilot tunnel (radial grouting method)
- Ground anchors, where the sleeved grouting pipe allows to carry out first the primary injection followed by a high pressure injection, granting a perfect cementation of the anchors in the bond length.
- Compensation grouting, which iscarried out in order to create a strengthened / consolidated area between the foundations of existing building and the soil below, in order to avoid settlements due to excavation of tunnel or huge underground spaces.
