Rishbin Co., Ltd

RishbinTube Mill

SHARE

Tube mill is to take a continuously coiled flat strip, align the two edges together, put the edges in the right place while they are welded, and then size and straighten the finished tubular products to the required specifications.
We also can produce api pipe mill line and high precise hf welded pipe mill line.The mill line is for producing round, square, rectangular steel tubes.

Most popular related searches

95mmx3.0mm ERW Tube Mill (80mpm)

Main Specification of ERW Tube Mill

  • Pipe Diameter: Φ25~Φ95 (50x 100) mm
  • Wall thickness: 1.8mm ~ 3.0mm
  • Raw Material: Carbon steel and semi alloy steel
  • Pipe Length: 4m ~ 9m
  • To-Length Accuracy: +/-3mm / total length

Raw Material Condition of ERW Tube Mill

  • Low carbon steel and low construction steel HR, CR or galvanized steel
  • Mechanical Characteristics
  • Width of Strip: 80mm ~300mm
  • Thickness of Strip: 1.8mm ~3.0mm
  • ID of Coil: 480mm ~ 520mm (ID508mm)
  • OD of Coil: Max 1800mm,
  • Weight of Coil: Approx. 3 tons per each side

Tube Mill Line Specification

  • Mill Speed: 40 ~ 80m/min
  • Direction of Operation: (To be confirmed by Buyer)
  • Total Power: Approx 600KW

Working Process of ERW Tube Mill

Uncoiling - Shearing and End welding – Material Cage - Forming - Welding – Cleaning - Cooling - Sizing - Flying saw cutting – Run out table - Pipe collecting - Packing

Commissioning of ERW Tube Mill
1. The client shall prepare civil works such as plant building, equipment foundation, and cooling water pool as per equipment data provided by the supplier. Necessary installation apparatus (lifting rig, tools), installation accessories (wires, conduits, water tubes), and helping labors shall be arranged by the client
2. The buyer shall provide the water, power, and air to the joint of machine.

SERVICES
1. Guarantee period: The warranty will be maintenance, maintain in the guarantee period of one year starting from delivery, which is in the conditions of correct operation. (Natural disasters or factors which can`t forced by human are excluded)

2. Detail Engineering

  • Layout and General Arrangement drawing
  • Foundation Layout drawing
  • Operation and Maintenance Instructions


3. Training
During Installation and commissioning of the equipment, our engineers shall provide the training to buyer`s workers to operate and maintain the equipment. Additional training can be provided on request.

  • Foundation construction, electrical works, and civil engineering;
  • Electrical wire, mechanical tubes, water tubes between machines;
  • Lubricating oil, recirculation oil, gear box oil, recirculation cooling water;
  • Safety equipments and non-standard safety items;
  • Testing material;
  • Engineering service required at the Buyer`s site.