Zudek s.r.l.

Power Test Services

SHARE

All Zudek machines are tested and run at full load in the factory before shipment to ensure proper functionality.

Most popular related searches

This rigorous testing process includes:

  • Radiographic examinations of all chiller components to optimize operating parameters to the required conditions.
  • Reduction of calibration times and subsequent on-site startup.
  • Providing the customer with a factory test guarantee, using certified instrumentation and delivering test protocols with recorded data.
  • Hydraulic pressure testing and radiographic examination are performed following the Zudek quality procedure, supervised and certified by notified bodies ISO 9001:2008 PED 97/23/CE.
  • Organizing maintenance and machine/system management courses with multiple levels of specialization.