Steps for Installation: Planning: Proximity to road and building: Sutera units can be installed on tight sites and in hard to reach places. Pick-up is not limited to a straight-on approach as with traditional dumpsters. Allow sufficient distance from fire hydrants and hydro lines (Collection truck needs at least 18 ft of vertical clearance to operate). Locate underground utilities.
Most popular related searches
locating underground utilities
utility excavator
underground utility
fire hydrant
underground excavation
underground utility locating
underground locating
gaskets
hydrant
dumpster
- Excavation: minimum 5 feet deep by 8 feet wide
- Level bottom of excavation
- Crane lowers first half of well
- Apply watertight gasket
- Crane lowers second half of well
- Assemble Lid, Frame and Bag as per instructions
- Insert bag into well. Frame will rest on walls of concrete well.
No poured concrete or reinforcing steel is required for backfilling. Our product can be installed in wet ground conditions without additional ballasting and will not float.