Refine by
Aquifer Pump Testing Articles & Analysis
5 articles found
This project is next to the Mississippi river, and required a large volume of groundwater to be pumped. THE SOLUTION A temporary dewatering and depressurization system was required for the excavation to proceed in a safe and efficient manner. ...
City West Water (CWW) has developed an Integrated Water Cycle Management (IWCM) Strategy which includes the development of aquifer storage and recovery (ASR) schemes to store recycled water and storm water to assist with meeting future growth, where these schemes can be demonstrated to be viable and cost effective. ...
Both of these sensors collect data in linear, linear average, or event logging modes, and are mostly used for long-term monitoring or slow-responding slug tests. The Level TROLL 700 is the Cadillac of the Level TROLL line. ...
Some states require 60-day aquifer yield tests, and plants must continue to monitor impacts to groundwater resources during the life of plant operation. ...
Shallow aquifers can cross-contaminate deeper aquifers through penetration of an intervening aquitard, via sandy intervals in the aquitard, along well casings, across long well screens, or around aquitard pinchouts. ...
