Metocean, bathymetry and geological conditions have been fully characterised for the site through several surveys. The optimum grid connection location was identified and a design completed for the shore crossing of the export power cable. Environmental surveys required to secure relevant permit and approvals were completed. ...
However, being in a wooded environment some 60 metres distant from the nearest power supply, considerable extra work was also required, as summarised below. A full survey of the existing sluice gates and hinterland. Measuring existing equipment for design and fabrication of adaptation for the actuators and protective shielding for the open pulleys and chains. The supply and ...
Date: January 15-22, 2019 Location: Jiangsu, China Equipment: M80 USV, Coda Octopus real time 3D imaging sonar Survey Mission: The purpose is to survey wind farm turbine pile foundation and inspect underwater cable scouring. 1. 15Km 100KV main cable inspection 2. 80Km 35KV loop cable inspection 3. 38 ...
A roll-along survey is a method for operator to survey a long line. After the initial survey, the operator will leave one cable on the ground and move the instrument and cables forward. So there is always one cable overlap between two surveys. Alternatively, the operator can ...
Dramatic incidents such as explosions, fires, floods and landslides make the headlines, but mundane mishaps such as diggers cutting through cables can cause just as many problems for businesses. With many companies now putting all their eggs in one electronic basket, power supply is a critical factor in business life with the fear of electricity blackouts identified as a major ...