Refine by
Dam Data Articles & Analysis
10 articles found
Overview: Lake Rottach / Lake Gruenten Case Study Summary Application Monitoring groundwater level in dams Location Kempten, Germany Products deployed A850 Telemetry Gateway A723 addIT RTU A753 addWAVE RTU OTT PLS Customer Wasserwirtschaftsamt Kempten Parameter recorded Groundwater level Intro The two bodies of water that we are talking about in this project, lake Rottach, covering 300ha, ...
OTT’s part of the project was to supply dataloggers for the monitoring of the river flows into and out of the Maguga and the Driekoppies dams. The technical needs were high-level: Technology designed specifically for environmental monitoring applications Robust in construction for long-term deployment Long-life internal power source Small installation footprint ...
With the new monitoring solution it was possible to reduce the workload and cost for collecting, reading out and transmitting of data significantly. An alarmfunction if limit values are exceeded provides more safety. Background Data of the Aabach reservoir: length: approx. 3 km width: max. 1,5 km total volume: approx. 20 million m³ Function - ...
It has been argued that dam construction and irrigation projects in Turkey and Syria would diminish the flow of the Euphrates River and increase salinity levels. ...
Historical data from 93 embankment dam failures were used to train and evaluate the applicability of these models. Two scenarios were applied with each model by either considering the whole data set without classification or classifying the set into small dams (48 dams) and large dams (45 ...
The model was verified by comparison of the results and available experimental data for dam-break flow, in a laboratory test, via a channel with sudden enlargement and erodible bed conditions. Comparison of these two sets of results shows that increasing the accuracy of flux modelling caused the model results to have a reasonable agreement with the experimental ...
The model was verified by comparison of the results and available experimental data for dam-break flow, in a laboratory test, via a channel with sudden enlargement and erodible bed conditions. Comparison of these two sets of results shows that increasing the accuracy of flux modelling caused the model results to have a reasonable agreement with the experimental ...
Total and end-use residential water consumption has been tracked in South East Queensland, Australia for a sample of up to 252 homes in post-drought conditions (dam supplies growing but water restrictions continued, changed water use behaviours still ‘fresh’), and during and post-flooding conditions (eased restrictions, 100% dam capacity). ...
Terrorist attack plots include water supply, transportation systems, and mining dams (Thomas, 2011). They are analyzing data from the materials obtained by the Navy SEALs to determine future terrorist plots and hideouts. ...
Terrorist attack plots include water supply, transportation systems, and mining dams (Thomas, 2011). They are analyzing data from the materials obtained by the Navy SEALs to determine future terrorist plots and hideouts. ...
