Biogas-fuelled Combined Heat Power Plant Installed at SAS Demeter Energies

Biogas-fuelled Combined Heat Power Plant Installed at SAS Demeter Energies

The 531 kWth of renewable thermal energy produced by the engine is used to heat the digesters, corn and alfalfa dryers at the site. It is also fed into the district heating network created by SAS Déméter Energies to heat the municipal buildings of Mauzé-sur-le-Mignon such as schools, colleges and the town hall. ...

ByClarke Energy


MCCSD Case Study

MCCSD Case Study

All non-biodegradable materials had to be manually removed, or they would simply pass through the process or accumulate in the aerator, aerobic digester, sludge dryer, and other points in the treatment facility. Manual removal of the non-dispersibles was difficult, expensive, and hazardous, but the City of Mendocino didn’t have a large enough budget to ...

ByAqualitec Corp.


ecoDRYER, the digestate dryer - Case Study

ecoDRYER, the digestate dryer - Case Study

A well established Suffolk farm growing a wide variety of soft fruits installed a Anaerobic Digester (AD) to produce biogas from their spoiled fruits. It feeds the combined heat and power (CHP) plant which generates 1.25MW/hr of electricity. As a result, the site produces approximately 12,000 tonnes of excess digestate per annum. Continuous emptying of the digestate storage tank is necessary to ...

ByAdvasol Management Limited (ASM)


Dublin - Ringsend - Case Study

Dublin - Ringsend - Case Study

However, by adding Cambi THP the volume of digested cake was reduced and the dryer project only had to be expanded by 50%. The area for extensions is limited and it was important to choose a sludge treatment method which was compact. The digestion process is carried out in three 4,500 m³ digesters that are fed at about 6 kg ...

ByCambi Group AS


Screentecs 4 years maintenance is $0 Mendocino, CA - 2010 - Case Study

Screentecs 4 years maintenance is $0 Mendocino, CA - 2010 - Case Study

All nonbiodegradable materials had to be manually removed, or they would simply pass through the process or accumulate in the aerator, aerobic digester, sludge dryer, and other points in the treatment facility. Manual removal of the non-dispersibles was difficult, expensive, and hazardous, but the City of Mendocino didn’t have a large enough budget to ...

ByAqualitec Corp.

  • Previous
  • Next
Need help finding the right suppliers?Try XPRT Sourcing. Let the XPRTs do the work for you
Back to top
About XPRT Media

XPRT is a global industry marketplace and information resource. Online product catalogs, news, articles, events, publications & more.


  • FAQs
  • Company sitemap
  • Category sitemap
XPRT is part of XPRT Media All Rights Reserved.
Terms
Privacy
  • XPRT RSS List
Our sites:
Environmental XPRT
Agriculture XPRT
Energy XPRT
Medical XPRT