Ditching Machine Articles & Analysis
2 articles found
Over 900 sandbags type "C" and 300 type "E" were used. A ditch was excavated along the river bed, upstream and downstream of the bridge abutment, then the sandbags were laid down one by one, using an excavator and lifting straps. ...
“We were on the right of way, but in most cases, we had to be in the ditch or behind the ditch in the right of way,” Jones says. “In a lot of situations when youʼre at the bottom of a ditch with a machine like that, you just have to pull the machine out and backhoe those areas, which slows ...
ByVermeer
