Rata Certification Articles & Analysis
3 articles found
The CEMS underwent Quality Assurance procedures mandated under 40 CFR Part 75 throughout the period of collection, including an initial certification RATA completed December of 2016, performed by Air Compliance Testing, Inc. and submitted as Report Number ...
The CEMS underwent Quality Assurance procedures mandated under 40 CFR Part 75 throughout the period of collection, including an initial certification RATA completed December of 2016, performed by Air Compliance Testing, Inc. and submitted as Report Number ...
The required timing for this initial certification, which involves a RATA and 7-day calibration drift test, is not specifically addressed in the construction permit. ...
