Logo XPRT
Companies
Products
Services
Software
Training
Applications
Sign in
List your business

Advertising options
  1. Home
  2. Articles
  3. schedule pvc pipe
Show results for
Products

Companies

News
Articles
Downloads

Refine by
Date

  • Older

Schedule Pvc Pipe Articles & Analysis

7 articles found

 Plastic Thread PVC Bell End Borehole Pipe Grey Schedule 20 Underground PVC Water Pipe for Industrial or Civil Use

Plastic Thread PVC Bell End Borehole Pipe Grey Schedule 20 Underground PVC Water Pipe for Industrial or Civil Use

Features: 1) Light weight, easy to load and unload: UPVC pipe is very light, convenient to handle loading unloading, and installing. 2) Good chemicals and drugs resistance: UPVC pipe has its excellent resistance to the erosion caused by acids and alkalines, a great help to the chemical industries. 3) Small resistance to fluidity: The smooth surface of UPVC pipe reduces resistance to the fluids. ...

ByXiamen Erikeke Industrial Co.,Ltd


NPS, Eastern River and Mountains Network - Case Study

NPS, Eastern River and Mountains Network - Case Study

Overview Since 1999, the National Park Service has conducted long-term ecological monitoring designed to identify and monitor conditions of their highest priority natural resources. The Eastern Rivers and Mountains Network is one of 32 networks formed to implement this integrated monitoring program which is tailored to specific needs of parks located in similar environmental settings. Due to its ...

BySolinst Eureka LLC


Disc Diffuser Specification Guidelines

Disc Diffuser Specification Guidelines

Heavy wall piping for long term service. Piping of SDR 26 or schedule 40 IPS for all PVC piping. ...

ByEnvironmental Dynamics International (EDI) - Axius Water


Scanning success - Case Study

Scanning success - Case Study

“Then they synchronized the solenoids to open and close the valves simultaneously and in sequence. An extensive piping system of 1.5-inch PVC Schedule 80 pipe connects everything.” ChemScan representatives programmed the computer and trained the staff, who found the learning curve uncomplicated. ...

ByIn-Situ Process


Park City, Utah Arsenic removal from ground water

Park City, Utah Arsenic removal from ground water

Incorporated in the first phase are automation, distribution piping and chemical feed capacity for a future expansion, projected for 4,000 gallons per minute. ...

ByFiltronics, Incorporated


A multi-parameter analyzer helps a Kentucky treatment plant step up to the plate and meet a new phosphorus limit in its permit

A multi-parameter analyzer helps a Kentucky treatment plant step up to the plate and meet a new phosphorus limit in its permit

"Then they synchronized the solenoids to open and close the valves simultaneously and in sequence. An extensive piping system of 1.5-inch PVC Schedule 80 pipe connects everything." ...

ByIn-Situ Process


Composite protection for slopes - Dallas Eastside Water Treatment Plant, Texas - Case study

Composite protection for slopes - Dallas Eastside Water Treatment Plant, Texas - Case study

A deadman anchor system–4 in. schedule 40 PVC pipe–was installed in the trench at the top of the slope and then the perforated geocell system sections were placed. ...

ByPresto Geosystems

  • Previous
  • Next
Need help finding the right suppliers?Try XPRT Sourcing. Let the XPRTs do the work for you
Back to top
About XPRT Media

XPRT is a global industry marketplace and information resource. Online product catalogs, news, articles, events, publications & more.


  • FAQs
  • Company sitemap
  • Category sitemap
XPRT is part of XPRT Media All Rights Reserved.
Terms
Privacy
  • XPRT RSS List
Our sites:
Environmental XPRT
Agriculture XPRT
Energy XPRT
Medical XPRT