In autumn 2019 and via Huber Technology srl another KKR Plastic Chain Scraper and further SSR scum removal systems were delivered to South Tyrol for eco center A.G. Pontives – Scum Removal Systems for the final sedimentation tanks The two circular sedimentation tanks of the sewage treratment plant in Pontives had only been equipped with a simple scum board that was fixed ...
Between June and November 2019, Tschuda and TsT eco, were allowed to supply the mechanical equipment for the expansion and modernisation of the sewage treatment plant Ropczyce. Chain scrapers for the sand traps In the two sand traps, approximately 22m long but only 90cm wide, KKR Plastic Chain Scrapers were installed to replace the former reciprocating ...
Tschuda won the tender for the scraping equipment and signed the contract for delivering the circular scraper system. The scraper is designed – almost in the standard version of ERR Stainless Steel Circular Scrapers – as a truss bridge with stainless steel antislip safety gratings and the light weight ...
By the radio transmission from the scraper bridge to a module mounted next to the tank, you can install your IFL at the location with the highest benefit. ...
Erecting a building over a half bridge scraper contains the odour but also creates a number of further potential problems. Firstly, a building significantly increases the half bridge scraper’s footprint and can present maintenance and access problems. ...