by:Castolin Eutectic GmbH based inKriftel, GERMANY
Castolin Eutectic offers specialized services to improve the longevity and efficiency of hydropower plants by addressing cavitation and erosion issues. - Cavitation and Erosion Solutions: Castolin Eutectic provides advanced repair and protective coatings for equipment affected by cavitation and erosion. Key services include the application of wear-resistant coatings and ...
Manufactured by:Fisher Barton based inWatertown, WISCONSIN (USA)
In-house testing ensures the safety and quality of all our mower deck blades. Our testing processes are designed to promote mower safety by checking our blades for defects and excessive wear that may occur during use and misuse. Bend tests verify that the proper ductility has been achieved in our mower deck blade manufacturing. These tests involve using a hydraulic-powered ram to steadily bend ...
Manufactured by:OSSBERGER GmbH Co. KG based inWeissenburg, GERMANY
Numerous inventions and patents in the almost one and a half centuries of the company's history show that development has always been the foundation of success. Emerging from hydropower, new business fields were added over the decades. Today, Ossberger, with its three corporate divisions, represents a regionally rooted medium-sized company that is internationally ...
by:ITASCA Software based inMinneapolis, MINNESOTA (USA)
In addition to hydroelectric dams, Itasca has worked on hydroelectric power plants including a pumped storage plant in Israel (Gavet) and hydropower stations in China (Baihetan, JinPing), India, and Colombia (Guavio and Sogamoso). Engineering analyses include site characterization, review of in-situ stress measurements, ground support evaluation and recommendation, excavation ...
by:Corbu Consulting Inc. based inToronto, ONTARIO (CANADA)
The team has completed numerous environmental impact assessment studies and environmental field monitoring programs associated to the development and operation of hydropower ...
by:Carbonneau Group based inBromont, QUEBEC (CANADA)
As grandiose as it is complex, dam-building doesn’t allow for any mistakes. It must be properly thought, planned and carried out to avoid preventable negative impacts on the environment and surrounding populations. Whether for the construction, maintenance or optimization of your hydroelectric station, Carbonneau Group harnesses the ingenuity, skills and experience of its team of ...
Manufactured by:Dutch Industries based inPilot Butte, SASKATCHEWAN (CANADA)
We work with a global network of suppliers to keep your project on the go! We have an entire department that scours the globe for the exact material that your project requires. Allowing you to focus on the big picture, our team sources the best material, at the best cost, and ensures timely delivery to keep your project on budget and on ...
by:Corbu Consulting Inc. based inToronto, ONTARIO (CANADA)
Hydroelectric power development involves interaction with, and authorizations from, numerous government agencies. Our team helps clients by providing the following services: Project Coordination; Client Representation; Liaison with Government and Regulatory Agencies; Negotiation ...
Manufactured by:Norcan Hydraulic Turbine Inc. based inCarleton Place, ONTARIO (CANADA)
In a lagging world economy, we understand that financing a state-of-the-art hydro solution can be a significant hurdle for prospective developers of new hydro sites, as well as owners of existing sites. Norcan recognizes the importance of hydro-electricity to community development, and that their customers need to maximize the return on their investments. Competitive financing solutions are ...
Manufactured by:Green Infrastructure Partners based inSt. John`s, NL, NEWFOUNDLAND (CANADA)
With over a 30 year history in the construction industry, Pennecon Heavy Civil has developed an unrivaled reputation built on hard work, passion, and a can-do attitude. From roadways and bridges to hydroelectric facilities and wind farms, we have worked on some of Canada’s most challenging construction projects, located in some of the harshest ...
Manufactured by:FAB 3R Inc. based inTrois-Rivières, QUEBEC (CANADA)
Our client had to implement three new generating unit groups and needed three new turbine shafts. Given the required dimensions, they couldn’t turn to just any company: they had to find one who could not only machine the nearly 9-meter-long shafts but do so with exceptional precision to meet the required tolerances and surface ...
by:Ecofish Research Ltd. based inCourtenay, BRITISH COLUMBIA (CANADA)
Ecofish conducts feasibility studies to assist clients in selecting and assessing viable locations for hydroelectric projects. Previous studies have identified streams that are currently under construction. Ecofish also supports clients by completing water license applications. Ecofish has recently teamed with an engineering firm, which assesses economic feasibility, to compliment the feasibility ...
by:Chant Construction Ltd. based inAurora, ONTARIO (CANADA)
We provide Operations and Maintenance Services or Post-construction Services where the service required by our customers is in-line with our considerable pool of expertise. Hydroelectric generating station operations. Commissioning support. Operations planning. Maintenance ...
by:BBA Inc based inMont-Saint-Hilaire, ONTARIO (CANADA)
BBA's civil engineering team is composed of highly-experienced and dynamic professionals whose know-how in structure and infrastructure is recognized both in Canada and abroad. The quality of the work and projects we carry out for our clients rests on our technical capabilities, our ability to always meet client and project schedules, our innovative solutions, and the excellent communications we ...
Manufactured by:Linde Gas AG based inPullach, GERMANY
Many industries have been served by the mobile nitrogen pumping services provided by Praxair Services, Inc. Our fleet of mobile nitrogen pump trucks and tube trailers can supply nitrogen over a wide range of temperatures: cold, for cooling hot catalytic reactor beds, or hot, for drying moisture-sensitive process units and catalysts. They can also respond rapidly to unexpected outages in fossil ...
Manufactured by:Coanda Water Intakes - ADENCO part of ADEN-GROUP Company based inKamloops, BRITISH COLUMBIA (CANADA)
Maximum desired Coanda weir length. Penstock or withdrawal flow (m^3/s, l/s, ft^3/s or gpm). Maximum operating water level (above weir). Design flood level (above ...
by:KGS Group based inWinnipeg, MANITOBA (CANADA)
KGS Group is highly specialized in the hydroelectric, water resources, and dam safety fields. Through their years of experience in the consulting industry, the principals and senior technical staff of the KGS Group have played a major part in the conceptual development, detailed design, and construction of many of both major and small hydroelectric developments in Canada. In addition to new ...
by:Strata Drilling Group based inMarkham, ONTARIO (CANADA)
Strata Drilling Group employs state-of-the-art Rock Coring (BQ & NQ sizes) Air Rotary with Symmetrix technology to drill into the bedrock. The Symmetrix system, patented technology, provides simultaneous casing advancement with various sizes of ballistic carbide bits using a 375CFM air compressor. Symmetrix can drill straight holes at any angle (including horizontal) and to depths beyond 100 ...
by:Chant Construction Ltd. based inAurora, ONTARIO (CANADA)
Chant’s Project Development Services include the full range of skills required to identify, evaluate, plan, design, permit, construct, commission, and operate renewable energy projects and sites. Our corporate focus on the development of hydro-electric power facilities is augmented by our involvement in wind power, other renewable energy sources and traditional non-nuclear generation in ...
by:ORTECH based inMississauga, ONTARIO (CANADA)
Based on extensive consultation between the Ontario Waterpower Association and its members (ORTECH was actively involved in this consultation process), the Ministry of Environment and the Ministry of Natural Resources recognized that the Renewable Energy Approval process in its original state would be poorly equipped to expedite the process for water power projects beyond what the Class EA ...