earthing-cable Videos
2 videos found
The cables are 3 x 500mm² or 3 x 600mm² depending on the location of the substation. The cables were laid at 1200mm deep and are surrounded in sand using our McCusker Sand cart ST1200. ...
Jun. 22, 2018
Place in it the correct position (cable P1 input, cable P2 output). Both the capacitor bank's power supply cable and the load cables for the installation itself must pass through the transformer. 4- Connect cables with the adequate cross-section to current transformer terminals S1 and S2 a. and connect the ...
May. 7, 2015